THERMAL & SPA POOL

Project Info

  • Starting Date

    2014-05-21

  • End of Date

    2014-11-07

  • Total Area

    3.650m2

THERMAL & SPA POOL


Turn-key Indoor Pool was constructed.
Spa Area;
 
• Lightweight Steel Partition Wall Works
• Gypsum plaster painting works
• Alum
• External Patios, waterproofing, alum and travertine coating works
• Exterior Siding and Roofing